Hotel FF&E Project Workflow

Hotel FF&E Project Workflow: From Project Files to Supply

This page shows how an I-HOTEL project moves after we receive the available drawings, BOQ, room types, quantities and specifications. The sequence covers scope review, initial costing, technical approvals, mock-up when needed, furniture production, complementary sourcing, quality checks, packing and shipment coordination.

Simple rule: we review the project information first. Initial costing is prepared for a representative room or agreed furniture scope. Detailed technical development follows after the initial costing level is accepted.
Project Flow Project-based
01 Project FilesDrawings, BOQ, room types and specifications Review
02 Initial CostingRepresentative room or agreed furniture scope Decision
03 Technical ApprovalsDrawings, materials, finishes and samples Approve
04 Production & SupplyManufacture, sourcing, QC, packing and shipment Deliver
In-house: custom furniture Partner-sourced: complementary FF&E
Clear Page Scope

What This Workflow Covers

A hotel FF&E project involves more than one process. This page focuses on the I-HOTEL project sequence as a manufacturer and project supplier. It does not try to replace the owner's full procurement program or the detailed factory manufacturing process.

This Page

I-HOTEL Project Workflow

How project files move through review, initial costing, approvals, production, sourcing, packing and shipment coordination.

Separate Guide

FF&E Procurement Planning

For wider planning around BOQs, scope, suppliers and procurement decisions, use the Hotel FF&E Procurement Guide.

Project Sequence

8 Stages from Project Review to Shipment Coordination

The exact scope can vary by project, but the order below keeps commercial decisions, technical approvals and production release clear.

01

Project Documents & Scope Review

We review the available drawings, BOQ, furniture schedules, room types, quantities, dimensions, materials, finishes, project location and other information that affects the furniture or FF&E scope.

Stage OutputClear scope for initial costing and a list of missing information where needed.
02

Initial Costing for the Agreed Scope

After the project information is reviewed, initial costing is prepared for a representative room or another agreed furniture scope. We do not need an approximate client budget to start this review.

Stage OutputAn initial cost level the project team can review before detailed technical work begins.
03

Technical Development & Shop Drawings

If the initial costing level is accepted, dimensions, construction details, interfaces, hardware and other production information are developed and coordinated against the latest approved project documents.

Stage OutputTechnical information ready for detailed review and approval.
04

Materials, Finishes, Hardware & Sample Approval

Veneers, laminates, lacquer colors, upholstery, metal finishes, hardware and other visible or functional details are confirmed from project specifications and approved samples.

Stage OutputApproved materials, finishes and technical selections for production release.
05

Mock-Up or Prototype Review

Where the project requires it, a prototype or full-scale mock-up room can be used to check proportions, finishes, hardware, comfort, furniture interfaces and other details before larger quantities are released.

Stage OutputValidated sample or mock-up information before volume production.
06

Furniture Production & Complementary Sourcing

Approved custom furniture enters production. Where complementary FF&E is included in the agreed scope, those items are coordinated separately through suitable specialist suppliers in Turkey.

Stage OutputApproved furniture in production and agreed sourced items under separate coordination.
07

Quality Review, Packing & Labelling

Manufactured furniture is checked against approved project information before packing. Packaging, item labels and loading preparation are planned according to furniture type, destination and shipment method.

Stage OutputProject items prepared for loading with the agreed packing and identification.
08

Shipment Coordination & Project Handover

Loading, export documents, road or sea shipment, delivery responsibilities and any required installation information are coordinated according to the destination, Incoterms and commercial agreement.

Stage OutputShipment responsibilities, documents and project handover information confirmed.
Approval Gates

Four Decisions That Move the Project Forward

A workflow becomes easier to manage when each handoff has a clear decision. These are the main control points in our project sequence.

Gate 01

Scope Ready for Costing

Drawings, quantities and specifications are clear enough to define the agreed costing scope.

Gate 02

Initial Cost Level Accepted

The project team accepts the initial costing level before detailed technical development continues.

Gate 03

Technical Details Approved

Drawings, dimensions, materials, finishes, hardware and samples are signed off for the agreed scope.

Gate 04

Production Release Confirmed

The approved information is released for manufacturing and any agreed complementary sourcing.

Supply Model

One Project Can Include Two Different Supply Routes

The quotation and project documents should keep manufactured furniture and partner-sourced FF&E clearly separated. That makes responsibilities, approvals and technical documentation easier to control.

In-House Production

Custom Hotel Furniture

Core custom furniture can be manufactured by I-HOTEL in İnegöl, Bursa according to approved drawings, quantities, materials, finishes and technical requirements.

See the manufacturing process →
Partner-Sourced Scope

Complementary FF&E

Doors, access systems, selected lighting, curtains, carpets, room equipment and other complementary products can be coordinated through specialist suppliers when they are included in the approved project scope.

See Hotel FF&E Solutions →
Start with Project Information

What to Send for the First Review

You do not need every document to make first contact. Send the information already available, and we can identify what is still needed for the agreed scope.

DrawingsPlans, elevations, sections, details, CAD or PDF files where available.
BOQ / Furniture ScheduleItem names, room types, quantities and drawing references where available.
Room Types & QuantitiesKing, twin, suite, accessible and other room categories that affect the furniture scope.
Materials & FinishesVeneers, laminates, lacquer colors, upholstery, metal finishes and finish schedules.
Project SpecificationsBrand, operator, hardware, performance or technical requirements that affect the items.
Project LocationCity, country and relevant delivery information for export and logistics planning.
Need help organising the documents? Use the Hotel Furniture BOQ Guide for quantity planning and the Architectural Drawing Guide for plans, elevations, sections and technical coordination.
Related Project Resources

Use the Right Guide for the Next Question

Each page below owns a different part of the project. Use them when you need more detail without turning this workflow page into a general procurement or manufacturing guide.

Workflow Questions

Hotel FF&E Project Workflow FAQ

Short answers to the questions that usually affect the order of review, costing, approvals and production release.

What should we send for the first project review?

Send the project information already available, such as drawings, BOQ or furniture schedules, room types, quantities, materials, finishes, specifications and project location. Missing information can be identified during the first review.

Do you prepare detailed shop drawings before the initial costing?

Normally, no. We first review the project information and prepare initial costing for a representative room or agreed furniture scope. Detailed technical development and shop drawings follow after the initial costing level is accepted.

What happens after the initial costing level is accepted?

The project can move into detailed technical development, shop drawings, material and finish coordination, hardware review, samples and other approvals needed before production release.

Is a mock-up room required for every project?

No. A mock-up room or prototype is used when it is useful or required by the project. The need depends on project scale, design complexity, approval requirements and the agreed scope.

Are all FF&E items manufactured by I-HOTEL?

No. Core custom furniture can be manufactured in-house in İnegöl, Bursa. Complementary FF&E items can be sourced through specialist suppliers when they are included in the approved project scope.

How long does the complete project workflow take?

There is no single fixed duration. Timing depends on project size, drawing readiness, approval speed, mock-up requirements, material availability, production scope, complementary sourcing, packing and shipment method.

Is site installation included in the standard workflow?

Installation or site supervision should not be assumed as standard. If these services are required, the responsibilities, location, timing and commercial terms should be confirmed separately in the project agreement.

Project Review

Have Drawings, a BOQ or a Furniture Schedule?

Send the project information you already have. We review the scope first, identify missing information where needed and then prepare initial costing for the agreed furniture package.

Send Project Files
We are online. Chat with us now!